About Of CEO & Team

Some Work Experience MURAT AKSAK CEO   Graduated from Civil Engineer Dept. At Istanbul Technical University ISTANBUL/TURKEY Accreditation Board for Engineering and Technology  (International validity, USA)   Worked and managed various Projects, one of the projects worthy to mention during is Skylandistanbul Project in ISTANBUL / TURKEY in which Mr. Murat AKSAK managed the project all through from its start to finish It is also of importance to acknowledge that the same team is working along side Mr Murat in Orcanile company today​.

Skylandistanbul Project

PROJECT COST: 800 MILLON USD

HEIGTH OF EACH BUILDING: 310 METERS

TOP 3 HIGHEST SKYSCRAPER IN EUROPE

HIGH-TECHNOLOGY CONSTRUCTION

HYDRAULIC SELF-CLIMBING FORMWORK SYSTEM

400.000 m³ C60 GREDE CONCRETE WORK

125.000 TON REINFORCEMENT STEEL WORK

Garri – 3 Fast Track OCGT Power Plant Project, Khartoum/SUDAN

Mr. Murat Aksak also worked at Garri where he managed the tanks in 3 Fast Track OCGT Power Plant Projects.

 

Tank Farm (Turn-Key)

4×20.000 m³ LDO+HFO Fuel Tanks

1×14.000 m³ Raw Water Tank

3×4.000 m³ Treated HFO Tanks

1×2.500 m³ Potable Water Tank

2×2.000 m³ Certification Tanks

2×2.000 m³ Demin Water Tanks

 

Company: PIOMAK Company (Germany)

Employer: SEMI ENERGY (Turkish)

Constultant: Lahmeyer (Germany) Owner: STPG (Sudan Government)